Planning to go for Wollongong Bathroom Makeover? Here are the steps for you to go about the process well, and make it a success.

Electrical and plumbing systems makeover

For Wollongong Bathroom Makeover, before connecting new electrical wires to the mains power, rough them in. You have to take care when you place new plumbing systems, so that – when the tiling is completed, the plumbing fittings are proper. New plumbing has to be set up in place for the drainage of clean cold and hot water.

Set up new ceiling and wall linings

Set up 6mm wall lining and take care to have the fibro board nailed every 150mm, not nailing into the freshly laid electrical wires and pipes. Use a pencil to measure the layout of the wire and pipe onto the new wall board, and mark the same. Nail or screw up the lining of the ceiling. In case you do not have a freestanding bath, you may construct the frame and have the bath installed. Make sure that the bath is properly installed, accommodating the thickness of the glue and tiles. Prior to Wollongong Bathroom Makeover, check all the pipes and linings.

Make your bathroom waterproof

Have the area around the bath, shower recess and bathroom floor waterproofed. When you get the floor waterproofed, make sure that the walls are waterproofed 100mm from the bottom. Waterproof the shower recess 100mm above the shower rose outlet. The bath must be done so too, 100mm above the bath lip, to and right around the floor.

Lay the cement screed in for the floor

Make the floor fairly flat and smooth with a little drop to the outlet of the drainage, before laying the floor tiles. Use a combination of cement and sand to be able to do it. It is best that you also add in a waterproofing agent. Set the level of the floor at the doorway. Then lay the cement screed in a stepwise fashion.

Tile the walls and floor

First lay the floor tiles, and then grout. Lay the tiles, ensuring that those are level while you lay. After you have cut and laid the bathroom tiles, you need to grout the tiles and buff them clean.

Set up plumbing fixtures and fitting

Install the taps and plumbing fittings, fit all the soap holders, towel rails etc, and ensure bathroom vanity is level and silicone-sealed around the top.

Paint and clean

You should do this Wollongong Bathroom Makeover after you ensure no leaks in plumbing, and everything is correctly fitted.